Existing retaining walls are intended to be carried forward as a relic of the existing structure and providing inspiration for the architectural concept of the new building to serve as a “Threshold” to the Park. The new building has been sited at the location of the existing clubhouse that was demolished in late 2016. Therefore, the planning of the new $3.8 million Activity Building facility began. At that time it was determined that the current plan configuration and condition of the building did not lend to a practical refurbishment of the existing structure. In early 2016 SFS Architecture was engaged to study the feasibility of the re-utilization of the existing Meadowbrook Country Club facility for JCRPD program use. Addition of Meadowbrook Activity Center Building